Most of the leading manufacturing sectors are facing the problem of devoting more time for inspection and controlling the dimensional specifications of a product manufactured by them. This is due to the unavailability of controlling methods because most of the industries do not provide the control plan to the operator. In order to overcome this drawback, the operator at the work centre must be provided with both Work Instructions as well as Control Plan. This paper presents a method which combines both Work Instructions and Control Plan.